The boys of the Friday Night Group descended upon Chris Lyon's new layout to run a full scale operating session seeing as Chris has completed all trackwork at "meteoric speed". Just imagine, less than six months earlier, Chris's basement had no benchwork or lighting in place. The railroad certainly has come a long way in a short time!While Chris chose to stagger the commencement of trains, by the time the session was in full swing, eight operators were kept busy simultaneously as four 2-man crews. Peter and I began the session in care of BNSF train "701 Northbound", a drag of coal hopper empties. We were told this train would probably run throughout the duration of the entire session (as it later becomes "702 Southbound" with loads) plus other work to boot! That's Peter and I watching our train as it enters the yard in care of two BNSF locomotives. The yard appears empty at this point, but within a short time, it would take on a totally different appearance once other trains began their assignments.
Now, this is my kind of operations! Peter and I acquired our power at the BNSF engine facility (the image shows the remaining power at the facility), proceeded to the North end of the main yard where we picked up a long string of hoppers. To create the illusion of distance on the layout, Chris's train orders read "Proceed northbound to inside main and traverse the layout five times." So Peter and I pulled out of the yard in a northbound direction with our train. Due to the lengthy mainline on the layout, we soon realized that two or three "cycles" around the room were sufficient to create the illusion we were running this drag for a long period of time. By now, other activity was happening so operators had to be in visual contact with train crews working yards and industries along the line. Tons of fun! On our last leg of our cycles, we then pulled 701 across and onto the south lead of the major classification yard where we uncoupled our power, ran around our train and classified the coal empties as going to either the "Port Coal Mine" or the "Starboard Coal Mine".
With this done, we disconnected our power and took it to the CN locomotive facility in Richmond for servicing. We acquired two CN locomotives, headed back to the classification yard and gathered the block of empties for the Port Coal Mine and headed out onto the main to the mine where we exchanged empties for loads and returned to the major yard. This shot to the left taken a few days earlier shows the Port Coal Mine area. During our session, only orange cars were destined for this mine location while green coal traffic headed to the Starboard Coal Mine. Check out the grain train passing by!

We repeated this process for the cars in the yard destined to the Starboard Coal Mine. With the mine runs done, there was now a lengthy string of loaded coal cars in the major yard. We swapped the CN power once again for BNSF colours, coupled onto the loaded string and cycled the layout two or three times before dropping the loads at the major yard, disconnecting the power and storing it at the BNSF engine facility north of the yard. By this time, all other boys were done their jobs and enjoying some refreshments and treats!
Other jobs throughout the evening included a container train, "CN 102 Southbound" working the container terminal with the aid of a very capable pair of CN/BCRail units. This train also traversed the layout a number of times before returning to continue work at the container terminal. Fred ran (away) with this train! (Just kidding, Fred!)That's the hectic container terminal visible in the image to the left.
The BNSF "Grain Train" ran in the experienced hands of Mr. Meek, working the three major grain elevators and the flour mill and traversing the layout a number of times before returning to the Grain Terminal to tie up.Two locals kept other crews quite busy and entertained...CN 501 and 504. John and Stanley held honours on one of these trains, and I believe Chris himself ran the other. With lots of switching chores included, I'll be asking for one of these trains next time, Chris.Yes, there was a great deal of laughter as operators were teased if they did not get up to speed quickly with the power routing Chris has designed in one of his yards...and then there was that *&%$ three way turnout! All in all, a very rewarding evening of train ops was had by everyone in attendance. We now wonder what Chris's layout will look like the next time we arrive for an ops session?!PS. To see Chris's layout in action, check out www.lyonvalleynorthern.blogspot.com where you will be entertained with a video segment.Cheers, Mike